Our Process
The goal of Mobix is being related to validated concepting tools from market to persue the construction of serious applications solving client desires and user needs. In our process, our team works intertwined and alternates through each design and development phase, making the process stronger and more src. Bellow we will present the corresponding phases in isolated ways.
The product process of Mobix is divided in three main steps, the first one is when the team build date about the target and market. In the second phase, is when the innovative ideas are constructed, documented and validated. The final step our teams runs towards the most fitable techs in order to make it real.
The team works in sprints of two weeks in agile process, so the engenieers and the designers start at the same point. Each side of the conception goes to its tools until intersect one other to present our client a rentable purposes of valuable products.
https://www.mobixtec.com/static/phases-25b02751951994ebf0cb00b392bc8bf9.svg
Design Process
The design process is to define the product, understand the problem, context and reason for the project’s existence, as well as understand the pains and needs of customers and synthesize all this data in deliverables, hypotheses are created and are validated throughout the process, which after the defined solution we start for the creation of a structure mapping all points of need and relationship, validated, and built several levels of validation until we reach the final piece, so that the project is documented its structure, behavior, libraries and business model.
Phases
Here’s a brief overview of our typical project process. We try to keep things moving fairly quickly and break projects out into phases with collected feedback/review at the end of each phase.
Immersion and research
During this phase, we will understand the problem we are facing, gather information about the project, and discover the user’s pain points and needs.
Briefing, Client interview, Duties and desires, Platforms map, Stackeholder interview
Synthesis
We will analyze the information of the previous phase and synthesize them, finding opportunities, and understanding the problem in-depth.
Persona, Lean canvas, Value proposition, Heuristics, Hypotesis, User jorney, Storyboard
Ideate
We will explore the possible solutions, understand the structure and evaluate them based on the framed problem.
Design principles, Top five, Co-creation session, Feedback, Sitemap, Carding sorting
Prototyping
During the last phase, the solution begins to come to life, where it will be evaluated, iterated, delivered, and documented.
Wireframe, System design, Low fidelity prototype, High fidelity prototype, Handoff
https://www.mobixtec.com/static/desingSide-c81c42b297f76fd0fd9c4f361b95e142.svg
Development Process
The front of development work in its first phases are working together with design in order to define and analyze aspects of the new product, after the final design delivery, the creation and planning of activities begins, where the next stages where the product will be sequenced it is built, tested and iterated to make the MVP.
Phases
Here is a brief overview of our typical development process. We grow the product with steps that occur dynamically and that can come back if necessary.
https://www.mobixtec.com/static/developmentSide-b094fad9219cfa5eb5730ca67507430c.svg
Immersion and research
This phase happens in parallel to the first design phase, where the development team defines and analyses aspects of the new product.
Architecture definition, Technologies definition, Functional and Non-funcional requiments
Synthesis
We will analyze the information of the previous phase and synthesize them and create a work plan
Work plan, Product definition
Define
This phase is where the project organization begins, we will analyze the project requirements according to the handoff document delivered in the last design phase, list the functionalities, create the activities, and manage the project.
Features selection, Requirements analysis, Complexity metrics, Sprint, Performance evaluation
Develop
This phase is where the project is codified, revisions, corrections, and continuous work management are carried out.
Code, Test implementation, Version control, Code review, Conflict and priority management
Deliver
It is at this stage that the project is delivered, alignments, testing and reporting are carried out.
Homologation control and test, Production control, Continuous deploy, Product follow up
Maintain
In the last phase, there is a detection of things that need to be added or even corrected, checking the solution and planning improvements.